Total remodeling work was carried out on this property.
Our design department developed a design with 2 bathrooms, 1 WC, 2 bedrooms and a separate laundry room.
Indicatively, the works carried out at the property are:
- Removal of a large part of the masonry.
- Construction of new masonry.
- Ceiling construction using drywall with spot and concealed lighting.
- New total installation of heating piping using multilayer pipes.
- New total electrical installation including new power and lighting supplies, DATA network and alarm wiring.
- Supply and installation of tiles and sanitary ware in the bathrooms.
- Placement of solid wood flooring.
- Sanding and polishing of wooden floors.
- Supply and installation of aluminium frames with four-season energy glazing and electric shutters.
- Supply and installation of wardrobes, kitchen, internal doors and security door.
- Application of two layers of acrylic putty on all surfaces of the house and painting with ecological paints of the company VIVECHROME.
Project completion time: 50 days