This is a five-story building constructed in 1978 in which the upgrade violations were throughout the building both internally and externally.
The new plans of the architectural design department, required the total removal of all internal walls and the construction of new ones to create new modern and functional apartments.
The electrohydraulic installations and the heating installations were completely replaced.
The floors inside the houses and the balconies were covered with granite tiles. The aluminium frames were replaced with new high energy efficiency windows.
Heating autonomy was provided for each apartment with the installation of an individual gas boiler.
The elevator was replaced with a new, advanced technology elevator in order to keep up with today’s safety and comfort standards.
The surrounding area and the parking area were designed with the best possible solutions.
A roof garden was also constructed for common use by the residents of the building.