Our company carried out works to add a floor to a building in the area of Glyfada.

It is a project using a metal frame, a construction that stands out for its speed of construction, its anti-seismic properties, its design freedom and its environmental friendliness.

The apartment was invested with hidden lighting, with the intense LED geometries on the ceiling of the living room framing the modern construction aesthetics.

The kitchen was designed with the aim of optimizing the ergonomics of the space. The materials are of high standards with the doors and the countertop being made by EGGER as well as BLOUM mechanisms.

An oriental design hammam has been added to the wet areas, while the outdoor Jacuzzi provides additional moments of relaxation.

For the heating and cooling of the space, a heat pump by Aermec was used in combination with a Nordstrom super slim Fun Coil.

Due to the peculiarity of the area and the existing building, the removal of the bazaars was a particularly difficult process and was therefore carried out using telescopic cranes.

The aluminium systems are of superior energy class, from the EUROPA company.

This project received particular enthusiasm, as its creation was one of the owner’s main dreams. As Np Team we thank him for trusting us!